References: planning of electrical engineering for locks
Replacement construction of the small Kiel-Holtenau lock
- Planning for renewal of electrical engineering so that continued operation is possible
- Determination of energy requirements for several scenarios
- Planning energy supply, traffic lights, lightning protection, grounding
- Risk assessment according to the Machinery Directive
New construction to replace the Obernau barrier
- Planning of electrical engineering for inflatable rubber dam, lock and boat lock
- Filling and emptying system of the weir hoses
- Power supply and distribution as well as control technology
- Earthing, lightning protection, equipotential bonding and surge protection
Overhaul and extension of the left chamber of the double chamber lock at Pleidelsheim
- Renewal of all electrical engineering
- New planning of energy supply, distribution as well as control and automation system
- Planning using the BIM method
- Grounding and lightning protection concept as well as construction monitoring
DEK northern route: new construction of 5 locks, electrical engineering
- Energy optimisation study
- Technical equipment for the operational buildings, earthing and lightning protection concept
- Planning of the control and instrumentation technology
- Creation of a 3D simulation model for preliminary tests
New construction of the 5th lock basin in Brunsbüttel, technical equipment
- System study on various conversion or replacement construction measures
- Energy supply and control technology
- Planning of earthing and lightning protection systems
- Risk assessment according to the Machinery Directive