References: planning of electrical engineering for locks
Replacement construction of the small Kiel-Holtenau lock
- Planning for renewal of electrical engineering so that continued operation is possible
- Determination of energy requirements for several scenarios
- Planning energy supply, traffic lights, lightning protection, grounding
- Risk assessment according to the Machinery Directive
Overhaul and extension of the left chamber of the double chamber lock at Pleidelsheim
- Renewal of all electrical engineering
- New planning of energy supply, distribution as well as control and automation system
- Planning using the BIM method
- Grounding and lightning protection concept as well as construction monitoring