New construction to replace the Obernau barrier

  • Planning of electrical engineering for inflatable rubber dam, lock and boat lock
  • Filling and emptying system of the weir hoses
  • Power supply and distribution as well as control technology
  • Earthing, lightning protection, equipotential bonding and surge protection

more informations

Replacement of Stuhlmüller weir on the river Pfinz, technical equipment

  • Replanning of the existing power supply
  • Earthing concept, surge protection and equipotential bonding
  • Construction supervision
  • Development of a maintenance and repair concept

more informations