Referenes: planning of electrical engineering for weir systems
New construction to replace the Obernau barrier
- Planning of electrical engineering for inflatable rubber dam, lock and boat lock
- Filling and emptying system of the weir hoses
- Power supply and distribution as well as control technology
- Earthing, lightning protection, equipotential bonding and surge protection
Replacement of Stuhlmüller weir on the river Pfinz, technical equipment
- Replanning of the existing power supply
- Earthing concept, surge protection and equipotential bonding
- Construction supervision
- Development of a maintenance and repair concept